Commerce Construcion Corporation We Guarantee Safety, Quality and Service
  • Home
  • About Us
    • Safety
    • Our Mission and Values
    • President's Message
    • Testimonials
  • Services
    • Marine Construction
    • Pile Driving Services
    • Diving Services
    • Lift Services
    • General Construction
  • Projects
    • Valero Energy Corporation
    • Sunoco Logistics Eagle Point Phase I and II
    • Conoco Philips
    • Harrah's Chester Downs
    • Exelon Power Blackrock and Norristown Fish Passages
    • Sunoco Inc. 1232 Project
  • Equipment
  • Clients
  • Photo Gallery
    • Pile Driving Gallery
    • Diving Gallery
    • General Construction and Lift Gallery
  • Links
  • Contact Us
    • Feedback

Marine Construction

Sunoco Logistics Eagle Point Phase 1 and 2

Rehabilitation of Docks 1, 2 and 3

Commerce Construction was hired for both phases of the rehabilitation work for Sunoco Logistics at their Eagle Point Facility. The work consisted of a considerable amount of dock demolition and disposals. In addition to the demolition and disposal scope, there were many new construction items that included new fender clusters, new walkways, and new concrete dolphins. The job was completed without any recordable injuries, and was also within budget and on schedule.

Click a photo to enlarge:

Sunoco Logistics Eagle Point Phase 1 and 2 - 4100 Driving Piles Sunoco Logistics Eagle Point Phase 1 and 2 - Fender Cluster 16 Demolition Sunoco Logistics Eagle Point Phase 1 and 2 - Fender Cluster 9 Installation

Harrah’s Chester Racetrack and Casino

Construction of Relieving Platform for Horse Racing Facility

Commerce Construction, through a Joint Venture with Buckley and Company, was contracted to build a relieving platform over an existing shipway in Chester, PA. The relieving platform doubled as a portion of the proposed harness racing track, now currently in use. The project was completed on schedule, within budget, and without injury.

Click a photo to enlarge:

Harrah’s Chester Racetrack and Casino - Falsework and Pipe Pile Installation Harrah’s Chester Racetrack and Casino - Pile Cap Installation Harrah’s Chester Racetrack and Casino - Racetrack Deck / Relieving Platform

Conoco Phillips Trainer, PA

Construction of New Ship Dock, Accessway System, Mooring Dolphins, and Boat Lifts

Commerce Construction was hired by Conoco Phillips to demolish their existing ship dock and in turn, construct a new ship dock, approachway, accessway, and a series of mooring dolphins for their Trainer Facility. The demolition and construction of these structures was completed while the refinery maintained their day-to-day operations and the ship dock remained open to petroleum cargo vessels.

Click a photo to enlarge.

Click a photo to enlarge:

Conoco Phillips Trainer, PA - Demolition of Old Ship Dock Conoco Phillips Trainer, PA - Construction of New Mooring Dolphins Conoco Phillips Trainer, PA - Construction of New Rock Socketed Mooring Dolphins Conoco Phillips Trainer, PA - Installation of New 40 Ton Removable Walkway

Commerce Construction Corporation | 603 Heron Drive | Unit One | Bridgeport, NJ 08014 | Ph. 856.241.0300 | Fx. 856.241.2460

Website Design by: donnellycreative.com